HARBOUR EXCHANGE

The project was carried out for Phoenix Contractors Ltd, using a Thysen Krupp Flat Panel and Grid System to which was attached a Chromatics Glass Panel. The roof was in Sarnafil. The project was made difficult as it had to be constructed between two existing buildings.

Value: £2,300,000
Location: Isle of Dogs, London